Name | Dr. Saif Ullah |
Designation | Associate Professor |
Department | Industrial Engineering (Taxila) |
Highest Qualification | PhD, Industrial Engineering |
Specialization | Assembly Line Balancing, Mix Model Sequencing, Flow Shop Scheduling, Meta Heuristic Algorithms, Optimization, Supply Chain Management |
Phone No | 0519047830 |
Cell No | |
Fax No | [email protected] |
[email protected] |
Degree/certificate |
Institute |
Year |
Post Doctorate, Specialized in Industrial Engineering |
Huazhong University of Science and Technology, Wuhan, P.R. China |
April 2016-April 2018 |
Doctorate in Mechanical Engineering, Specialized in Industrial Engineering |
Huazhong University of Science and Technology, Wuhan, P.R. China |
2012-2015 |
Masters in Mechanical Engineering, Specialized in Industrial Engineering |
Huazhong University of Science and Technology, Wuhan, P.R. China |
2008- 2011 |
Bachelor in Mechanical Engineering |
University of Engineering and Technology Taxila, Pakistan |
2004-2008 |
Inetermediate in Pre engineering |
IMCB, F-7/3, Islamabad, Pakistan |
2002-2004 |
Matriculation in Science |
IMCB, I-10/1, Islamabad, Pakistan |
2000-2002 |
SCOPUS Author ID: 56181803000
https://www.scopus.com/authid/detail.uri?authorId=56181803000
Web of Science Researcher ID: O-1110-2019
https://publons.com/dashboard/summary/
Research Gate Profile:
https://www.researchgate.net/profile/Ullah_Saif?ev=hdr_xprf&_sg=ZDoSATCTrRKGw02zM3038vPKruLPJRoi0bwZ5uZbgmvrQDcblkhOmcuUZLwBUlwKixay1_JJDAdE-vkwM2NyU0AV
Linkedin Profile:
https://www.linkedin.com/in/saif-ullah-973b7972/
Production Planning and Control
Remanufacturing and Supply Chain Management
Scheduling
Single and Multi Objective Optimization
Robust Optimization
Intelligent Algorithms
Neurosciences
Eronomics
Publications Patents 1. 一种订单分派调度与混合产品排序系统及方法 (CN 106444643 B) Granted Method and System for Order allocation and mixed model sequencing 2. 基于多层次滚动时域及多项目的调度计划生成方法 (CN 108537364 B) Granted Method and System for Resource Constraint Multi-Level Rolling Horizon Multi-Project Planning and Scheduling for Remanufacturing 3. 一种按摩器及水疗按摩装置 (CN 109893412B) Granted Dry Hydro-Therapy Full Body Massage System and Apparatus 4. Hydrotherapy Massage Apparatus for Foot Pain Treatment. (779/2018, 16th November, 2018, Under Examination in IPO Pakistan) 5. Method and System for Electrophysiological Signals Measurement with Real Time Adjustment of Size, Electrode Positioning and Spatial Resolution of the Headset. (104/2019, 19th February, 2019, Under Examination in IPO Pakistan) 6. 一种头部按摩装置 (CN 110755243 A) Pending Head Massage Device 7. Method and System for Electrophysiological Signals Measurement with Real Time Adjustment of Size, Electrode Positioning and Spatial Resolution of the Headset. (US20200178833A1)(Application Number 16793037, 18th February, 2020, Published online in USPTO on 11 June 2020) Books 1. Saif Ullah, Zailin Guan, “Multi objective assembly line balancing and sequencing problems”, LAP LAMBERT Academic Publishing, 10th October, 2017.
|
International Journal |
|
International Conference |
1. Saif Ullah, Qiong LIU, Chaoyong Zhang and Riaz Yasser, “Scheduling with uncertain processing times: applying β-robust schedule on two-machine flow-shop with constraints,” Proceedings of IEEM, 2009, pp. 1946-1951. 2. Qiong Liu, Na Liu, Saif Ullah, “A task group based multi-order critical chain identification algorithm,” Proceedings of IEEM, 2009, pp. 1494-1499. 3. Uzma Hameed, Zailin Guan, Saif Ullah, Zakria Ghulam, “A genetic algorithm approach for inventory optimization in reverse logistics”, International conference on future industrial engineering and application, Shenzhen, China, 2010. 4. Saif Ullah, Guan Zailin, Xu, Xianhao, He Zongdong, Wang Baoxi, “Multi-objective simultaneous assembly line balancing and buffer sizing”, In Proceedings of World academy of Science, Engineering and Technology, Jeddah, Saudi Arabia, 26-27 January 2015. 5. Saif Ullah, Guan Zailin, Xu Xianhao, He Zongdong, Wang Baoxi, “Modeling of facility location problem for reverse logistics system with uncertainty in forward and reverse flows of products”, The second international conference on manufacturing and industrial technologies (ICMIT 2015), Pattaya, Thailand, March 28-29, 2015. 6. Saif Ullah, Guan Zailin, He Zongdong, He Cong, Jun Cao, “Modeling of order oriented planning for printed circuit board assembly line”, The second international conference on manufacturing and industrial technologies (ICMIT 2015), Pattaya, Thailand, March 28-29, 2015. 7. Saif Ullah, “Smart Order Management using Modular Assembly Lines and Cyber Physical Systems”, in international workshop on ALBP 60 years later: State-of-the-Art and Future Developments Roadmap, 5-6 November, 2015, Toulouse, France. 8. Saif Ullah, Zailin Guan, Yue Lei, Fei Zhang, He Cong, “Intelligent integrated MRP, MPS and Detail Scheduling”, 2016 International Conference on Industrial Engineering and Operations Management” 23-25 September, 2016, Detroit, USA. 9. Lei Yue, Zailin Guan, Cong He, Dan Luo and Saif Ullah, Slotting optimization of automated storage and retrieval system(AS/RS) for efficient delivery of parts in an assembly shop using genetic algorithm: A case Study” 5th International Conference on Manufacturing, Optimization, Industrial and Material Engineering 2017 (MOIME 2017), Bali - Indonesia, 01 - 02 April 2017. 10. Yanyan Cui, Zailin Guan, Cong He, Lei Yue and Saif Ullah, “Research on remanufacturing scheduling problem based on critical chain management”, 5th International Conference on Manufacturing, Optimization, Industrial and Material Engineering 2017 (MOIME 2017), Bali - Indonesia, 01 - 02 April 2017. 11. Lei Yue, Zailin Guan, Jinsong Luo, Ullah Saif, Jahanzeb Mirza, “A drum-buffer-rope based heuristic for rolling horizon order release and mixed model scheduling in flexible manufacturing system”, CIE47 Proceedings, 11-13 October 2017, Lisbon / Portugal 12. Hao Wang, Zailin Guan, Ullah Saif, Jun Liang, Lei Yue, “A parallel-machine scheduling problem with a material handling device in PCB production environment”, 6th International Conference on Manufacturing, Optimization, Industrial and Materia Engineering 2018 (MOIME 201), Bandung- Indonesia, 24-25 March 2018.
|
|
Project Title: Development of Novel Dry Scalp EEG Measuring Electrode for Brain Activity Monitoring
Name of PI and Co-PI Duration of Project Completion Date Funding Amount Funding Agency
PI: Dr. Saif Ullah 08 Month 30-06-2016 1.258 Million PKR UET, Taxila
Co- PI:
1) Dr. Mirza Jahanzaib
2) Dr. Haris Aziz
3) Engr. Zahid Rashid
Project Title: Resource optimization in hospitals for healthcare 4.0 perspectives
Name of PI and Co-PI Duration of Project Completion Date Funding Amount Funding Agency
PI: Dr. Saif Ullah 36 Month In progress 6.65 Million PKR HEC (NRPU Project No. 20-17024)
Co- PI:
1) Dr. Mirza Jahanzaib
2) Dr. Wasim Ahmad
3) Dr. Salman Hussain
Director UGS (1st April to date)
OBE Coordinator in Department of Industrial Engineering
CPD activity team member in Department of Industrial Engineering
Technical Expert for percurement in Department of Industrial Engineering
Registered with Pakistan Engineering Council
Member of State key laboratory of digital manufacturing and technology, Huazhong University of Science and Technology, China (Sep 2008 to Jan 2011)
Member of National Engineering Research Center of Manufacturing Equipment Digitization, Huazhong University of Science and Technology, China (Sep 2012 to date)
Member of HUST-SANY joint laboratory of Advanced Manufacturing Technology, Huazhong University of Science and Technology, China (Sep 2012 to date)
Undergraduates
Post Graduates
Associate Professor at Department of Industrial Engineering, UET Taxila, Pakistan since Feburary 2021
Assistant Professor at Department of Industrial Engineering, UET Taxila, Pakistan (December 2015 to Feburary 2021)
Lecturer at Department of Industrial Engineering, UET Taxila, Pakistan (March 2012 to December 2015)
Department of Industrial Engineering, University of Engineering and Technology, Taxila, Pakistan
State Key Laboratory of Digital Manufacturing and Technology, School of Mechanical Science and Technology, Huazhong University of Science and Technology, China
Awards and Scholarships |
||||||||||||||||||||||||||||||||||||||||||||||||
National |
||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||
International |
||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
International Conference Oral Presentations Research paper presentation on “Flow Shop Scheduling” in International conference of industrial engineering and engineering management, (IEEM), Hong Kong, (December, Hongkong, 2009) Research paper presentation on “Project Management” in International conference of industrial engineering and engineering management, (IEEM), Hong Kong(December, Hongkong 2009) |
||
Research paper presentation on “Multi-objective simultaneous assembly line balancing and buffer sizing” In international conference of World academy of Science, Engineering and Technology, Jeddah, Saudi Arabia(January, 26-27, Jeddah, Saudi Arabia, 2015) Session chair in international conference of World academy of Science, Engineering and Technology, Jeddah, Saudi Arabia(January, 26-27, Jeddah, Saudi Arabia, 2015) Research paper presentation on “Modeling of Facility Location Problem for Reverse Logistics System with Uncertainty in Forward and Reverse Flows of Products” In 2nd international conference on manufacturing and industrial technologies (March, 28-29, Pattaya, Thailand, 2015) Research paper presentation on “Modeling of Order Oriented Planning for Printed Circuit Board Assembly Line” In 2nd international conference on manufacturing and industrial technologies(March, 28-29, Pattaya, Thailand, 2015) Research presentation on “Smart Order Management using Modular Assembly Lines and Cyber Physical Systems”, in international workshop on ALBP 60 years later: State-of-the-Art and Future Developments Roadmap” 5-6 November, 2015, Toulouse, France(November, 5-6, Toulouse, France, 2015) Research paper presentation on “Intelligent integrated MRP, MPS and Detail Scheduling”, in International Conference on Industrial Engineering and Operations Management” 23-25 September, 2016, Detroit, USA(September, 23-25, Detroit, USA, 2016)
National Conference Oral Presentations Orzanized and Patrticipated as "Speaker" on a CPD Seminar on "Industry 4.0" at Department of Industrial Engineering", University of Engineering and Technology, Taxila, Pakistan on 16th January 2018 Research paper presentation on, “Resource optimization through multi-level planning and scheduling of constrains”, 2nd international conference on knowledge based textiles, February, 14-15, 2023, National Textile University, Faisalabad, Pakistan.
|
Workshops and Seminars |
|
PhD Supervision
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. PhD Scholar: Engr. Aisha Tayyab (Registration Number 2017-UET/PhD-EM-11) Thesis Title: An Intelligent Planning and Scheduling System for Hospitals-Case of Operation Theater Complex Degree Status: Completed (March 2023). 2. PhD Scholar: Engr. Muhammad Imran (Registration Number 2019-UET/PhD-EM-14) Research Title: Resource Constraint Multi Project Planning and Scheduling in Uncertain Environment Degree Status: In Progress 3. PhD Scholar: Engr. Waqas Javed (Registration Number 2019-UET/PhD-IE-15) Research Title: Simulation based optimization for dynamic planning and scheduling of production system. Degree Status: In Progress. 4. PhD Scholar: Engr. Muhammad Usman (Registration Number 2021-UET/PhD-IE-17) Research Title: Optimization of integrated production and maintenance Planning and scheduling using digital twins & Industry 4.0 concepts Degree Status: In Progress. 5. PhD Scholar: Engr. Umair Shahid (Registration Number 2022-UET/PhD-EM-21) Research Title: Resource Optimization in Hospitals for Healthcare 4.0 Perspectives Degree Status: In Progress.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MSc Supervision
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Trainings and Internships
|
|||||||||||||||||||||||||||||||||||||||
|
PhD Supervision
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. PhD Scholar: Engr. Aisha Tayyab (Registration Number 2017-UET/PhD-EM-11) Thesis Title: An Intelligent Planning and Scheduling System for Hospitals-Case of Operation Theater Complex Degree Status: Completed (March 2023).
2. PhD Scholar: Engr. Muhammad Imran (Registration Number 2019-UET/PhD-EM-14) Research Title: Resource Constraint Multi Project Planning and Scheduling in Uncertain Environment Degree Status: In Progress
3. PhD Scholar: Engr. Waqas Javed (Registration Number 2019-UET/PhD-IE-15) Research Title: Simulation based optimization for dynamic planning and scheduling of production system. Degree Status: In Progress.
4. PhD Scholar: Engr. Muhammad Usman (Registration Number 2021-UET/PhD-IE-17) Research Title: Optimization of integrated production and maintenance Planning and scheduling using digital twins & Industry 4.0 concepts Degree Status: In Progress.
5. PhD Scholar: Engr. Umair Shahid (Registration Number 2022-UET/PhD-EM-21) Research Title: Resource Optimization in Hospitals for Healthcare 4.0 Perspectives Degree Status: In Progress.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MSc Supervision
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|